web analytics

Bathroom – More progress ;-)

After another evenings work I was able to get the plumbing work finished. Its not difficult work at all but you do need to take care to ensure that each joint is properly soldered etc… The last thing you need is to have a leak after everything is in place when it can be more difficult to fix! Below you can see the shower pump connected to the hot and cold water supplies. This pump will automatically switch on when the shower valve is opened. So it only needs a 240V electrical supply. I decided to have it concealed in an area that will eventually be covered in! Hopefully, this will become apparent in the next few evenings!

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.