Bathroom Saturdays progress

Well another productive day. Was able to get the Wet Wall fitted ( that is the white shiny material on the wall which surrounds the bath) and also the bath is now in position. Still some plumbing work to do though!! That will be today’s job after church etc….
The above picture shows the wet wall in place.
The bath is in place – but not fully anchored as yet. Last job of the evening was to drill holes for the taps and fix them in place. Next phase will be a plumbing phase with lots of copper pipe and plastic waste pipe to fix etc. The goal for this phase it to have the bath operational and ready for first use 😉 It is amazing how large the room feels when empty and how much smaller it felt when the bath was brought in.