I have been working on the inside of the garage making it ready for the builder to come back and lay the floor. Now that the roof is watertight I have moved all my raw material inside so it can dry off – it is now stored on the rafters. It has been wet, frozen and covered in snow, that has not made it too pleasant to work with.
In any case as can been see from the photo below the inside of the wooden walls are now clad with 9mm Stirling board – next step is to anchor the walls to the foundation walls. Then the floor can be poured. Once the floor is set, I will divert back to do some outside work – there is still plenty of that to do!!!!
I am also now setting up some fluorescent lights which will make it better for working inside.