We still have show on the ground – but on Saturday 21st February – we saw an excellent day of blue skies and sunshine. It was still cold and the roof battens were still frozen but the nice weather conditions meant that we were able to make very good progress. Result is that the roof is now watertight and we were able to make good progress on building up the gable wall.
As you can see from the photo below the vertical posts on the top part of the gable are being installed and the cladding sheet being installed. By the end of the day the gable was almost complete with just a few more posts to install and some sheeting to apply!
Below is a photo taken on the Sunday morning which shows how close the gable is to completion. It is always very encouraging to get to a landmark stage like – making the roof watertight etc..
This of course means that I will be need to install some temporary lighting inside the garage as it getting decidedly gloomy in there now!!!
Thanks to Phil who spent the afternoon working with me on this very productive day – it makes such a different when you do not need to climb up and down to cut material and lift materials to the hight places – having those other two hand makes such a big difference š
As you can see in the photo below we still have some snow lying around – the temperature last night was about -7 degrees – which is cold š