Work is proceeding well with the garage. Yesterday it rained all day so now a good day for building but the builders never stopped as you can see the block wall is almost up to ceiling height! Today we have blue skys and much warmer temperatures π
Also the surface water drain has been installed and the trench back filled!
Hoping to do the other two walls over the weekend which will be timber frame construction!