More progress with the bathroom – yesterday evening between me and Phil we managed to get most of the lining board mounted. Below you can see the view looking back form the window into the bathroom looking through the new door aperture. This is a useful angle as you can see the lining boards in their nature colour compared with the door to Phils bedroom which has been been in place for about 11 years or so! Note the difference in colour. It will take some time for the new pine work to match that colour but it will happen. Well of to start fitting the wet wall boarding which will is to be placed around the bath – target for today ( Saturday ) is to get the bath installed and operational so that the members of the Buchan house hold can get a proper wash again 😉
Category: Bathroom
Bathroom Further Progresss
Now well into the construction phase. Roof is now done and new wall with door opening complete. Pine lining boards are now being applied to the walls and the Wet Wall for the shower area is about to be fitted. Always good to be into the construction phase of a project all together more satisfying 😉

Bathroom – Saturday progress
Well it has been a busy day. 6am start and first job after having a shower was to lower the bath out of the window – much to the amusement of a neighbour who happened to also up early and out on the street. That done then back to work and – floor done by 9am and then down with the tiled walls!!! And down with the wall with the door!
No door now but floor finished
Now reconstructing – stud partition now in place and plaster board on one wall 😉
However it has been a long so time for bed 😉
More tomorrow.